Project Control & Verification
Posted by EdmontonPMAug 14
Live Webinar August 21st, 2013 11:00 am – 11:45 pm EDT
Duration: 45 Min Credits: 0.5 PDU Category B – Free PDU
Presented By: PROJECTinsight (Metafuse Inc)
In Cooperation With: Core Performance Concepts (Rep #1399)
Note: Please record this as a Category B Presentation – You will receive a Category B certificate from PROJECTInsight
As the project team develops the code to meet the authorized requirements, the newly built functionality must be verified to ensure it reflects the authorized requirements and satisfies the business need.
This can be accomplished by implementing the following integrated methodology deliverables:
- Project status report,
- Team status report,
- Issue definition,
- Risk definition,
- Change request,
- Unit test defect log(s),
- System integration test (SIT)
- Defect log(s),
- User acceptance (UT) defect log,
- Requirements traceability log
Learn how to each deliverable can be beneficial to your project.
Click to register for Project Control & Verification
Leave a Reply